Experience

  • Site and Project Engineer / Assistant Project Manager

    at Eurogeotecnica

    August 2010 - August 2012

    Lleida

    Responsibilities: As a Site Engineer I supervised the construction of two projects that included the following infrastructure: - Two pumping stations, four reservoirs, four pipelines to connect the pumping stations with the reservoirs and a pipeline to connect a dam that was being built at that time with the main pumping station. - Supplied area: 6,500 ha. - Material execution budget: 23 million €. - Client: Aigues del Segarra Garrigues (ASG). As a Project Engineer I was in charge of drafting a modified project in order to accomplish the new Environmental Impact Statement published by the European Union during the construction of the infrastructure mentioned previously. I also was responsible for supervising the as-built of both projects at the end of the construction.

  • Site and Project Engineer

    at Dopec

    May 2007 - November 2009

    Lleida

    As a Site Engineer I supervised the construction of a project that included the following infrastructure: - Two pumping stations, two reservoirs, two pipelines to connect the pumping stations with the reservoirs, two filtering stations and two irrigation networks. - Supplied area: 700 ha. - Material execution budget: 7 million €. - Client: Regs de Catalunya SA (REGSA). Nowadays it is called Infraestructures.cat. As a Project Engineer I was responsible for drafting three projects; the first one to redefine the deficiencies found in the original project, the second one to include an area that had not been considered initially in the project, and the third one to define remote control and automation of the infrastructure built. At the same time, I also collaborated on drafting projects of different areas.

  • Collaborator and Project Engineer

    at University of Lleida and REGSA

    June 2006 - December 2006

    Lleida

    Responsibilities: Analysis of different irrigation scheduling in pressurized irrigation networks to reduce costs. - Supplied area: 1,200 ha. - Material execution budget: 7 million €. - Client: Regs de Catalunya SA (REGSA). Nowadays it is called Infraestructures.cat.

Education

  • Master's Degree in Agricultural Engineering

    at University of Lleida

    2004 - 2007 (3 years) Lleida

  • Bachelor Degree in Agricultural Engineering

    at University of La Rioja

    1998 - 2004 (6 years) La Rioja

Languages

  • Spanish Native

  • Catalan Negotiation

  • English Negotiation

Followers (5)

Hives